Wordless Wednesday

IMG_0814

Purple drywall now covers the patio on the east side of the building, near the patio of the future grill restaurant.

IMG_0821

The loading dock in the basement gets some finishing work.

IMG_0888

Signs of the Mission Revival architecture abound, especially in the prevalent archways throughout the building.

IMG_0852

A first look at lane 1 in Aztec Lanes, the bowling and games center located on the first floor of the Union.

IMG_0913

A view of the 300-seat theatre from the front of the room.

Wordless Wednesday occurs all over the internet each Wednesday, when bloggers let photos speak for themselves.

Want to see more photos and updates about Aztec Student Union? Be sure to “like” the project on Facebookfollow it on Twitter or visit AztecStudentUnion.com to view the live construction camera.

Advertisements

About Lorena

I'm a San Diego native and a proud two-time alumna of the San Diego State University School of Journalism and Media Studies. I currently work as the marketing and communications manager for the Associated Students of SDSU.
This entry was posted in Construction and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s