Upwards and Onwards

Have you met Mr. Crane, yet? You’ve probably seen him in action.

He’s rather hard to miss. Especially since he was joined by another Mr. Crane early Friday morning.

He came with quite the entourage.

He, too, is rather tall with a full extension of 300 feet, and can do all the heavy lifting that the first crane does (up to 300 tons).

With two cranes working the Aztec Student Union project site, expect lots of change in the weeks to come. Day by day, expect the “skeleton” of the union to grow upwards and onwards.

Want to stay up to date on all things Aztec Student Union? Then be sure to “like” us on Facebook, follow us on Twitter or visit AztecStudentUnion.com.

Advertisements

About Lorena

I'm a San Diego native and a proud two-time alumna of the San Diego State University School of Journalism and Media Studies. I currently work as the marketing and communications manager for the Associated Students of SDSU.
This entry was posted in Construction. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s